Table 3.3 Projected populations at the end of the design life for the towns used in Table 3.1
Town
Projected
population
Score
Town
Projected
population
Score
A
27 500
10
G
17 000
2
B
26 500
9
H
16 500
2
C
22 000
6
J
16 000
1
D
18 500
3
K
16 000
1
E
17 000
2
L
15 500
1
F
17 000
2
nity populations in towns 'A' to 'L' in Table 3.1. Table 3.3 shows individual community scores for projected population at the end of the design life. The ways that the other scoring ranges were determined are shown in Tables 3.43.9.
3.3.2
Weighting
Although all the criteria included should be relevant to the selection process some will be more important than others. Applying a weighting system is a way of reflecting the relevant importance
Table 3.4 On-site sanitation failure
Description
Score
On-site sanitation has already failed
10
On-site sanitation is very likely to fail during the design life
7
On-site sanitation may fail during the design life