< previous page page_29 next page >

Page 29
Table 3.5 Polluting industries
Description
Score
More than 50% of the effluent is generated by industry
10
2550% of effluent is generated by industry
5
Less than 251 of waste effluent is generated by industrial sources
1
Note: As these guidelines relate only to sewerage the effect of industrial effluent strength on treatment costs has been ignored.

Table 3.6 Unit cost of construction
Unit cost
Score
Unit cost
Score
40 00045 000
10
65 00070000
5
45 00050 000
9
70 00075 000
4
50 00055 000
8
75 00080 000
3
55 00060 000
7
80 00085 000
2
60 00065 000
6
85 00090 000
1

Table 3.7 Tourist impact
Description
Score
Over 80% of the community's income is generated by tourism
10
4080% of income is from tourism
5
No significant tourism income
1

Table 3.8 Consumers' ability/willingness to pay for sewerage
Description
Score
Community can/will repay the full capital and operating costs of the scheme
10
A 50 per cent subsidy is required on the construction cost
7
The community can only afford/is willing to pay operating costs
4
A subsidy is required to make operating costs affordable
1

of the criteria in the selection process. The problem with weighting systems is that it is difficult to apply them objectively. In Table 3.1 'tourist impact', for example, is shown as three times more important than 'projected population'. This is a

 
< previous page page_29 next page >